← Back to map

Eland Solar & Storage Center, Phase 1 Hy

Kern County, California · EIA plant ID 61168 · Operator: 68SF 8me LLC
SolarBatteriesSolar PhotovoltaicBA: LDWP
Nameplate460MWSummer 350 MW
Generators2in service
Net generation698GWh12 mo to Aug 2026
Capacity factor41%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%202420252026202741.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202468.324.4%—
202568440.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
61168BatteriesBA150150Nov 2024Operating—coming soon
68SF8Solar PhotovoltaicPV309.6200Nov 2024Operating—coming soon

Owner / operator

Operator: 68SF 8me LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Arevon Asset Management100.0%460 MW

Nearby plants

Within 80 km.
Eland Solar & Storage Center, Phase 2 Hy458 MW0.8 km
Springbok Solar Farm 2155 MW2.9 km
Springbok Solar Farm 1105 MW3.5 km
Hecate Energy Beacon Solar 356 MW4.7 km
Beacon Solar Plant Site 247 MW5.1 km
Hecate Energy Beacon Solar 450 MW5.6 km