← Back to map

Mosaic South Pierce Operations

Polk County, Florida · EIA plant ID 10004 · Operator: Mosaic Fertilizer LLC
OtherAll OtherBA: TEC

×8 MW other retired since 2020 (latest Dec 2025)

Nameplate38MWSummer 33 MW
Generators1in service
Net generation64GWh12 mo to Aug 2026
Capacity factor22%other units, summer MW
Heat rate—thermal plants only
First online1992

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh200220052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202521.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2002306.894.7%—
200427484.3%—
200525177.5%—
2006203.162.7%—
2007138.642.8%—
2008135.241.6%—
200942.913.3%—
201078.324.1%—
2011158.749.0%—
201216149.5%—
2013207.964.2%—
2014238.373.5%—
2015242.474.8%—
2016204.863.0%—
2017220.968.2%—
2018247.576.4%—
2019254.578.5%—
2020195.960.3%—
2021119.336.8%—
202299.930.8%—
2023155.848.1%—
2024120.437.0%—
202587.527.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TG2All OtherST3833Jan 1992Operating—coming soon
TG1All OtherST7.54Jan 1978Retired Dec 2025—coming soon

Owner / operator

Operator: Mosaic Fertilizer LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Mosaic Fertilizer LLC100.0%38 MW

Nearby plants

Within 80 km.
Brewster Solar—3.4 km
Durrance60 MW4.4 km
Jamison Solar (FL)75 MW4.9 km
Polk1,458 MW6.5 km
Hines Energy Complex2,266 MW7.2 km
OE_FL10—7.6 km