Hines Energy Complex
Polk County, Florida · EIA plant ID 7302 · Operator: Duke Energy Florida, Inc
Nameplate2,266MWSummer 2,144 MW
Generators12in service
Net generation10,810GWh12 mo to Aug 2026
Capacity factor58%gas/coal/oil units, summer MW
Heat rate7,263Btu/kWhfossil units, electric fuel, HHV
First online1999Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 2,506.5 | — | — |
| 2002 | 3,034.6 | — | — |
| 2003 | 3,187.9 | 69.2% | 7,349 |
| 2004 | 4,772.1 | 54.4% | 7,120 |
| 2005 | 6,071.9 | 63.9% | 7,103 |
| 2006 | 7,154.2 | 56.1% | 7,065 |
| 2007 | 7,902 | 60.3% | 7,080 |
| 2008 | 10,822.4 | 64.4% | 7,114 |
| 2009 | 11,261.7 | 67.2% | 7,196 |
| 2010 | 12,945.8 | 77.3% | 7,154 |
| 2011 | 12,238.5 | 72.7% | 7,135 |
| 2012 | 12,998.5 | 77.4% | 7,151 |
| 2013 | 12,378.5 | 73.9% | 7,222 |
| 2014 | 11,408.9 | 68.1% | 7,226 |
| 2015 | 12,233.3 | 73.0% | 7,412 |
| 2016 | 12,300.7 | 67.8% | 7,150 |
| 2017 | 13,208.8 | 74.2% | 7,044 |
| 2018 | 13,368.2 | 74.6% | 7,199 |
| 2019 | 11,459.8 | 63.7% | 7,271 |
| 2020 | 11,586.4 | 64.0% | 7,348 |
| 2021 | 11,517.6 | 63.8% | 7,256 |
| 2022 | 12,240.6 | 67.2% | 7,337 |
| 2023 | 10,951.6 | 60.1% | 7,383 |
| 2024 | 12,354.3 | 67.0% | 7,277 |
| 2025 | 11,753.9 | 62.6% | 7,325 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingYes
Net summer MW on gas2,054
Net summer MW on oil2,054
Time gas → oilup to 6 h (EIA 6H)
Time oil → gasup to 6 h (EIA 6H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1GT | Natural Gas Fired Combined Cycle | CT | 173.4 | 167 | Apr 1999 | Operating | — | coming soon |
| 1GT2 | Natural Gas Fired Combined Cycle | CT | 173.4 | 167 | Apr 1999 | Operating | — | coming soon |
| 1ST | Natural Gas Fired Combined Cycle | CA | 199.7 | 167 | Apr 1999 | Operating | — | coming soon |
| 2GT | Natural Gas Fired Combined Cycle | CT | 178.5 | 194 | Dec 2003 | Operating | — | coming soon |
| 2GT2 | Natural Gas Fired Combined Cycle | CT | 178.5 | 191 | Dec 2003 | Operating | — | coming soon |
| 2ST | Natural Gas Fired Combined Cycle | CA | 191.3 | 191 | Dec 2003 | Operating | — | coming soon |
| 3GT | Natural Gas Fired Combined Cycle | CT | 178.5 | 171 | Nov 2005 | Operating | — | coming soon |
| 3GT2 | Natural Gas Fired Combined Cycle | CT | 178.5 | 176 | Nov 2005 | Operating | — | coming soon |
| 3ST | Natural Gas Fired Combined Cycle | CA | 204 | 176 | Nov 2005 | Operating | — | coming soon |
| 4GT | Natural Gas Fired Combined Cycle | CT | 199 | 188 | Dec 2007 | Operating | — | coming soon |
| 4GT2 | Natural Gas Fired Combined Cycle | CT | 199 | 176 | Dec 2007 | Operating | — | coming soon |
| 4ST | Natural Gas Fired Combined Cycle | CA | 212.5 | 180 | Dec 2007 | Operating | — | coming soon |
| 2 | Natural Gas Fired Combined Cycle | CC | 601.2 | 516 | planned Dec 2003 | not_current | — | coming soon |
| 3 | Natural Gas Fired Combined Cycle | CC | 601 | 516 | planned Dec 2005 | not_current | — | coming soon |
| 4 | Natural Gas Fired Combined Cycle | CC | 517 | 461 | planned Dec 2007 | not_current | — | coming soon |
Owner / operator
Operator: Duke Energy Florida, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Duke Energy Florida, Inc | 100.0% | 2,266 MW |
Nearby plants
Within 80 km.
| OE_FL10 | — | 4.1 km |
| Tiger Bay | 278 MW | 5.1 km |
| Mulberry Cogeneration Facility | 128 MW | 6.8 km |
| Mosaic South Pierce Operations | 38 MW | 7.2 km |
| Jamison Solar (FL) | 75 MW | 8.7 km |
| Orange Cogeneration Facility | 157 MW | 10.2 km |