OE_FL10Under construction

Polk County, Florida · EIA plant ID 65290 · Operator: Origis Energy USA, Inc
SolarBA: FPC

75 MW under construction (Solar Photovoltaic), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 75 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
OFL10Solar PhotovoltaicPV74.974.9planned Dec 2026Under construction—coming soon

Owner / operator

Operator: Origis Energy USA, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Tiger Bay278 MW1.5 km
Hines Energy Complex2,266 MW4.1 km
Mosaic South Pierce Operations38 MW7.6 km
Brewster Solar—9.8 km
Mulberry Cogeneration Facility128 MW10.9 km
Jamison Solar (FL)75 MW11 km