Durrance

Polk County, Florida · EIA plant ID 63495 · Operator: Tampa Electric Co
SolarSolar PhotovoltaicBA: TEC
Nameplate60MWSummer 60 MW
Generators1in service
Net generation105GWh12 mo to Aug 2026
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-50510GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202120222023202420252026202720.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2021103.519.7%—
202299.118.9%—
2023107.520.4%—
202488.616.8%—
202550.49.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV6060Jan 2021Operating—coming soon

Owner / operator

Operator: Tampa Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tampa Electric Co100.0%60 MW

Nearby plants

Within 80 km.
Jamison Solar (FL)75 MW3.8 km
Mosaic South Pierce Operations38 MW4.4 km
Brewster Solar—4.6 km
Polk1,458 MW5.8 km
Lake Hancock Solar50 MW8.6 km
Mosaic New Wales Operations136 MW9.3 km