← Back to map

Lake Hancock Solar

Polk County, Florida · EIA plant ID 61657 · Operator: Tampa Electric Co
SolarSolar PhotovoltaicBA: TEC
Nameplate50MWSummer 50 MW
Generators1in service
Net generation93GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2019

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20192020202120222023202420252026202721.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201933.410.2%—
202083.219.1%—
202194.621.8%—
202293.321.5%—
202389.820.7%—
202492.221.2%—
20259321.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV49.549.5Apr 2019Operating—coming soon

Owner / operator

Operator: Tampa Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tampa Electric Co100.0%50 MW

Nearby plants

Within 80 km.
Alafia Solar60 MW2.1 km
Polk1,458 MW4.5 km
Brewster Solar—7.5 km
Durrance60 MW8.6 km
Payne Creek Solar70 MW9.2 km
Mosaic South Pierce Operations38 MW10.7 km