Polk

Polk County, Florida · EIA plant ID 7242 · Operator: Tampa Electric Co
Natural gasNatural Gas Fired Combined Cycle⛽ Dual-fuelBA: TEC

×133 MW natural gas retired since 2020 (latest Mar 2025)

Nameplate1,458MWSummer 1,238 MW
Generators6in service
Net generation3,087GWh12 mo to Aug 2026
Capacity factor28%gas/coal/oil units, summer MW
Heat rate8,210Btu/kWhfossil units, electric fuel, HHV
First online1996Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-2000200400600800GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202528.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0008,00010,000200520102015202020258,210 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20011,702.5——
20021,956——
20031,67032.9%9,987
20041,823.835.8%10,227
20051,384.927.3%10,699
20061,752.534.5%10,832
20071,902.326.8%11,043
20081,666.422.6%10,798
20091,533.820.9%10,731
20101,821.225.2%10,240
20111,865.925.9%10,387
20121,63222.6%10,918
20131,478.420.5%11,346
20141,704.223.6%10,563
20151,886.226.1%10,754
20162,223.930.7%10,478
20178,242.173.5%7,527
20188,230.173.3%7,338
20196,988.962.3%7,205
20206,773.960.2%7,187
20215,824.851.9%7,133
20227,30165.1%7,158
20235,847.952.1%7,173
20245,770.751.3%7,373
20254,288.939.3%7,534

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo484,774 MMBtu
Last month with liquid burnAug 2026
Switch while operatingYes
Net summer MW on gas300
Net summer MW on oil300
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1CTNatural Gas Fired Combined CycleCT195177Sep 1996Operating—coming soon
2Natural Gas Fired Combined CycleCT175.8150Jul 2000Operating—coming soon
2CCNatural Gas Fired Combined CycleCA513461Jan 2017Operating—coming soon
3Natural Gas Fired Combined CycleCT175.8150Apr 2002Operating—coming soon
4Natural Gas Fired Combined CycleCT199.3150Mar 2007Operating—coming soon
5Natural Gas Fired Combined CycleCT199.3150Apr 2007Operating—coming soon
1—CC326.2255Sep 1996not_current—coming soon
1CANatural Gas Fired Combined CycleCA133.459Sep 1996Retired Mar 2025—coming soon

Owner / operator

Operator: Tampa Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tampa Electric Co100.0%1,458 MW

Nearby plants

Within 80 km.
Brewster Solar—3.1 km
Lake Hancock Solar50 MW4.5 km
Alafia Solar60 MW5.4 km
Durrance60 MW5.8 km
Mosaic South Pierce Operations38 MW6.5 km
Payne Creek Solar70 MW7.5 km