Wheatridge Optimization IIUnder construction

Morrow County, Oregon · EIA plant ID 70450 · Operator: Wheatridge Optimization II, LLC
SolarBA: BPAT

190 MW under construction (Batteries, Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 190 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BA1BatteriesBA6060planned Dec 2027Under construction—coming soon
PV1Solar PhotovoltaicPV130130planned Dec 2027Under construction—coming soon

Owner / operator

Operator: Wheatridge Optimization II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Wheatridge Hybrid280 MW0.4 km
Wheatridge 1100 MW0.4 km
Wheatridge Optimization I—0.5 km
Sunstone Solar—7.3 km
Tutuilla Solar—9.1 km
Finley Buttes Landfill Gas5 MW14.5 km