← Back to map

Finley Buttes Landfill Gas

Morrow County, Oregon · EIA plant ID 58687 · Operator: Finley BioEnergy LLC
OtherLandfill GasBA: BPAT
Nameplate5MWSummer 5 MW
Generators3in service
Net generation13GWh12 mo to Dec 2025
Capacity factor31%other units, summer MW
Heat rate—thermal plants only
First online2007

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%201420162018202020222024202631.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201334.882.8%—
201434.882.8%—
201524.859.0%—
201627.966.2%—
20172969.0%—
201832.477.0%—
201931.675.1%—
202035.584.1%—
20213992.6%—
202237.288.5%—
202332.477.1%—
20242866.5%—
20251331.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Landfill GasIC1.61.6Dec 2007Operating—coming soon
GEN2Landfill GasIC1.61.6Dec 2007Operating—coming soon
GEN3Landfill GasIC1.61.6Dec 2007Operating—coming soon

Owner / operator

Operator: Finley BioEnergy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Finley BioEnergy LLC100.0%5 MW

Nearby plants

Within 80 km.
Tutuilla Solar—8.7 km
Sunstone Solar—10 km
Pacific Canyon Windfarm LLC8 MW10.4 km
Sand Ranch Windfarm LLC10 MW11.5 km
Big Top LLC2 MW11.9 km
Wagon Trail LLC3 MW12.2 km