Wheatridge Hybrid
Morrow County, Oregon · EIA plant ID 62745 · Operator: Wheatridge Wind Holdings, LLC
Nameplate280MWSummer 280 MW
Generators3in service
Net generation663GWh12 mo to Aug 2026
Capacity factor31%wind units, summer MW
Heat rate—thermal plants only
First online2020
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 93 | 31.8% | — |
| 2021 | 713.5 | 40.7% | — |
| 2022 | 605.3 | 29.6% | — |
| 2023 | 682.1 | 32.2% | — |
| 2024 | 738.2 | 35.1% | — |
| 2025 | 668.3 | 31.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BTRY | Batteries | BA | 30 | 30 | Mar 2022 | Operating | — | coming soon |
| SOLAR | Solar Photovoltaic | PV | 50 | 50 | Mar 2022 | Operating | — | coming soon |
| WIND | Onshore Wind Turbine | WT | 200 | 200 | Nov 2020 | Operating | — | ge 2.52-116 |
Owner / operator
Operator: Wheatridge Wind Holdings, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Wheatridge Wind Holdings, LLC | 100.0% | 280 MW |
Nearby plants
Within 80 km.
| Wheatridge 1 | 100 MW | 0 km |
| Wheatridge Optimization II | — | 0.4 km |
| Wheatridge Optimization I | — | 0.9 km |
| Sunstone Solar | — | 7.5 km |
| Tutuilla Solar | — | 8.9 km |
| Finley Buttes Landfill Gas | 5 MW | 14.6 km |