Winchester Solar II, LLCUnder construction

Cochise County, Arizona · EIA plant ID 70406 · Operator: Torch Operating Company, LLC
SolarBA: WALC

176 MW under construction (Batteries, Solar Photovoltaic), first expected May 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 176 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BA-2BatteriesBA87.887.8planned May 2027Under construction—coming soon
PV-2Solar PhotovoltaicPV87.887.8planned May 2027Under construction—coming soon

Owner / operator

Operator: Torch Operating Company, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Winchester Solar I, LLC—2.5 km
Red Horse III30 MW12.9 km
Roadrunner Solar and BESS470 MW13.5 km
Red Horse 281 MW16.2 km
Sulphur Springs20 MW16.2 km
Apache Solar I40 MW16.2 km