← Back to map

Red Horse 2

Cochise County, Arizona · EIA plant ID 58833 · Operator: Red Horse 2
SolarOnshore Wind TurbineSolar PhotovoltaicBA: TEPC
Nameplate81MWSummer 81 MW
Generators2in service
Net generation188GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2015

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh20162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202629.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20157728.5%—
2016220.134.4%—
2017214.234.0%—
2018226.135.2%—
2019213.133.3%—
2020226.235.1%—
2021212.933.5%—
2022214.133.1%—
2023203.430.2%—
2024194.930.1%—
2025144.222.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RH2SSolar PhotovoltaicPV5151Aug 2015Operating—coming soon
RH2WOnshore Wind TurbineWT3030Aug 2015Operating—vestas V110-2.0

Owner / operator

Operator: Red Horse 2. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Red Horse 2100.0%81 MW

Nearby plants

Within 80 km.
Winchester Solar II, LLC—16.2 km
Winchester Solar I, LLC—16.9 km
Red Horse III30 MW17 km
Roadrunner Solar and BESS470 MW26.5 km
Sulphur Springs20 MW29.5 km
Apache Solar I40 MW30.6 km