Apache Solar I

Cochise County, Arizona · EIA plant ID 60964 · Operator: Arizona Electric Pwr Coop Inc
SolarBatteriesSolar PhotovoltaicBA: WALC
Nameplate40MWSummer 40 MW
Generators3in service
Net generation55GWh12 mo to Dec 2025
Capacity factor32%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202631.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20171329.5%—
201849.928.5%—
20195229.7%—
20205531.3%—
202153.330.4%—
202255.131.5%—
202355.331.6%—
202455.531.6%—
202555.431.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
AEPB1BatteriesBA1010Jun 2024Operating—coming soon
AEPS1Solar PhotovoltaicPV2020Oct 2017Operating—coming soon
TRIB1BatteriesBA1010Jun 2024Operating—coming soon

Owner / operator

Operator: Arizona Electric Pwr Coop Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Sierra Southwest Cooperative100.0%40 MW

Nearby plants

Within 80 km.
Apache Station782 MW0.9 km
Sulphur Springs20 MW2.8 km
Roadrunner Solar and BESS470 MW4.7 km
THREE SISTERS Solar Generation and BESS—6.5 km
Winchester Solar I, LLC—14.4 km
Winchester Solar II, LLC—16.2 km