← Back to map

THREE SISTERS Solar Generation and BESSPlanned

Pinal County, Arizona · EIA plant ID 68298 · Operator: THIS BN, LLC
BatteryBA: AZPS

600 MW planned (Batteries, Solar Photovoltaic), first expected Apr 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
THSI1BatteriesBA300300planned Apr 2029Planned—coming soon
THSI2Solar PhotovoltaicPV300300planned Apr 2029Planned—coming soon

Owner / operator

Operator: THIS BN, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Apache Solar I40 MW6.5 km
Apache Station782 MW6.6 km
Sulphur Springs20 MW9.1 km
Roadrunner Solar and BESS470 MW11.2 km
Winchester Solar I, LLC—19.2 km
Winchester Solar II, LLC—20.5 km