← Back to map

Red Horse III

Cochise County, Arizona · EIA plant ID 60285 · Operator: Red Horse III
SolarSolar PhotovoltaicBA: TEPC
Nameplate30MWSummer 30 MW
Generators1in service
Net generation56GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202621.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201638.328.9%—
201779.330.2%—
201881.230.9%—
201975.728.8%—
202077.129.3%—
202174.228.2%—
202272.627.6%—
202348.118.3%—
202452.219.8%—
202555.621.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RH3Solar PhotovoltaicPV3030Jul 2016Operating—coming soon

Owner / operator

Operator: Red Horse III. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Red Horse III100.0%30 MW

Nearby plants

Within 80 km.
Winchester Solar I, LLC—10.8 km
Roadrunner Solar and BESS470 MW12.3 km
Winchester Solar II, LLC—12.9 km
Sulphur Springs20 MW14.9 km
Apache Solar I40 MW16.9 km
Red Horse 281 MW17 km