← Back to map

JasmineUnder construction

Kern County, California · EIA plant ID 70109 · Operator: aes clean energy
SolarCAISOBA: CISO

134 MW under construction (Batteries, Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 134 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
JASBEBatteriesBA64.464.4planned Dec 2027Under construction—coming soon
JASMISolar PhotovoltaicPV7070planned Dec 2027Under construction—coming soon

Owner / operator

Operator: aes clean energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Sandrini Solar 100195 MW1.6 km
Lakeview Battery Storage Facility1 MW4.8 km
Sandrini Solar 200200 MW5.9 km
ABEC Bidart-Old River LLC2 MW7.8 km
ABEC #4 dba CE&S Dairy1 MW8.1 km
Cawelo Water District Solar3 MW8.1 km