Sandrini Solar 200

Kern County, California · EIA plant ID 65663 · Operator: edpr ca solar park llc
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate200MWSummer 200 MW
Generators1in service
Net generation500GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202728.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202442.928.8%—
2025411.323.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN01Solar PhotovoltaicPV200200Dec 2024Operating—coming soon

Owner / operator

Operator: edpr ca solar park llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
edpr ca solar park llc100.0%200 MW

Nearby plants

Within 80 km.
Lakeview Battery Storage Facility1 MW1.4 km
Sandrini Solar 100195 MW5.3 km
Jasmine—5.9 km
ABEC Bidart-Old River LLC2 MW8.8 km
Adobe Solar20 MW9.1 km
ABEC #4 dba CE&S Dairy1 MW9.7 km