Sandrini Solar 100
Kern County, California · EIA plant ID 65664 · Operator: edpr ca solar park ii llc
Nameplate195MWSummer 195 MW
Generators2in service
Net generation247GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2024
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 11.5 | 15.4% | — |
| 2025 | 235.6 | 26.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN02 | Solar Photovoltaic | PV | 100 | 100 | Dec 2024 | Operating | — | coming soon |
| GENBA | Batteries | BA | 95.4 | 95.4 | Jul 2025 | Operating | — | coming soon |
Owner / operator
Operator: edpr ca solar park ii llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| edpr ca solar park ii llc | 100.0% | 195 MW |
Nearby plants
Within 80 km.
| Jasmine | — | 1.6 km |
| Lakeview Battery Storage Facility | 1 MW | 4.5 km |
| Sandrini Solar 200 | 200 MW | 5.3 km |
| ABEC Bidart-Old River LLC | 2 MW | 6.3 km |
| ABEC #4 dba CE&S Dairy | 1 MW | 6.7 km |
| Cawelo Water District Solar | 3 MW | 9.6 km |