← Back to map

Sandrini Solar 100

Kern County, California · EIA plant ID 65664 · Operator: edpr ca solar park ii llc
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate195MWSummer 195 MW
Generators2in service
Net generation247GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202420252026202729.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202411.515.4%—
2025235.626.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN02Solar PhotovoltaicPV100100Dec 2024Operating—coming soon
GENBABatteriesBA95.495.4Jul 2025Operating—coming soon

Owner / operator

Operator: edpr ca solar park ii llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
edpr ca solar park ii llc100.0%195 MW

Nearby plants

Within 80 km.
Jasmine—1.6 km
Lakeview Battery Storage Facility1 MW4.5 km
Sandrini Solar 200200 MW5.3 km
ABEC Bidart-Old River LLC2 MW6.3 km
ABEC #4 dba CE&S Dairy1 MW6.7 km
Cawelo Water District Solar3 MW9.6 km