← Back to map

Cawelo Water District Solar

Kern County, California · EIA plant ID 67000 · Operator: Scooby Solar, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202320242025202631.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20230.916.8%—
20246.730.4%—
20256.931.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
15612Solar PhotovoltaicPV2.52.5Oct 2023Operating—coming soon

Owner / operator

Operator: Scooby Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Scooby Solar, LLC100.0%3 MW

Nearby plants

Within 80 km.
Vulcan San Emidio Solar1 MW0 km
Jasmine—8.1 km
Sandrini Solar 100195 MW9.6 km
Algonquin SKIC20 Solar LLC20 MW10.3 km
Algonquin SKIC 10 Solar, LLC10 MW10.3 km
Lakeview Battery Storage Facility1 MW11.7 km