← Back to map

Pivot Energy PPA 29 LLCUnder construction

Placer County, California · EIA plant ID 70101 · Operator: Pivot Energy
SolarCAISOBA: CISO

2 MW under construction (Batteries, Solar Photovoltaic), first expected Jan 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 2 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PA29BBatteriesBA0.10.1planned Jan 2027Under construction—coming soon
PPA29Solar PhotovoltaicPV2.22.2planned Jan 2027Under construction—coming soon

Owner / operator

Operator: Pivot Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Rio Bravo Rocklin28 MW0.8 km
Roseville66 MW2.6 km
Lincoln Landfill5 MW3.4 km
Lincoln WWTF Hybrid4 MW4.9 km
Roseville Energy Park225 MW7.7 km
Sierra Pacific Lincoln Facility19 MW8.3 km