Lincoln WWTF Hybrid

Placer County, California · EIA plant ID 65382 · Operator: lincoln solar star, llc
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate4MWSummer 4 MW
Generators2in service
Net generation6GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20212022202320242025202626.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20212.624.9%—
20227.128.9%—
20236.426.2%—
20246.426.2%—
20256.326.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ESSBatteriesBA11Mar 2022Operating—coming soon
PVSolar PhotovoltaicPV32.8Aug 2021Operating—coming soon

Owner / operator

Operator: lincoln solar star, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
ST TOTAL Strong Solar Statutory Trust100.0%4 MW

Nearby plants

Within 80 km.
Lincoln Landfill5 MW2.4 km
Rio Bravo Rocklin28 MW4.1 km
Pivot Energy PPA 29 LLC—4.9 km
San Francisco Bay Coffee1 MW5.5 km
Roseville66 MW5.7 km
Sierra Pacific Lincoln Facility19 MW5.8 km