← Back to map

Rio Bravo Rocklin

Placer County, California · EIA plant ID 10772 · Operator: Rio Bravo Rocklin
OtherWood/Wood Waste BiomassCAISOBA: CISO
Nameplate28MWSummer 24 MW
Generators1in service
Net generation147GWh12 mo to Dec 2025
Capacity factor68%other units, summer MW
Heat rate19,447Btu/kWhfossil units, electric fuel, HHV
First online1989

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202568.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,00010,00015,00020,0002005201020152020202519,447 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200114164.7%17,751
2002174.279.9%15,906
2003169.977.8%16,802
2004167.876.5%8,735
2005157.873.9%—
2006152.471.3%—
2007137.463.6%16,139
2008162.975.6%16,846
2009181.384.5%16,725
2010172.380.0%17,891
2011185.286.2%16,665
2012177.482.4%15,446
2013185.386.4%15,984
2014189.888.4%10,581
2015185.786.2%14,082
2016169.178.1%15,345
2017164.376.3%18,403
2018176.482.0%15,788
2019168.977.9%15,000
2020177.181.4%15,291
2021165.576.5%15,584
2022172.879.9%16,604
2023146.667.8%18,151
2024155.271.7%18,213
202514768.1%19,447

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Wood/Wood Waste BiomassST27.924.4Jun 1989Operating—coming soon

Owner / operator

Operator: Rio Bravo Rocklin. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Rio Bravo Rocklin100.0%28 MW

Nearby plants

Within 80 km.
Pivot Energy PPA 29 LLC—0.8 km
Roseville66 MW2.5 km
Lincoln Landfill5 MW2.5 km
Lincoln WWTF Hybrid4 MW4.1 km
Roseville Energy Park225 MW7.3 km
Sierra Pacific Lincoln Facility19 MW7.9 km