Staccato BESSUnder construction

Fayette County, Texas · EIA plant ID 70021 · Operator: Sunraycer Assets I LLC
BatteryERCOTBA: ERCO

201 MW under construction (Batteries), first expected Apr 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 201 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
STACBBatteriesBA200.5200.5planned Apr 2027Under construction—coming soon

Owner / operator

Operator: Sunraycer Assets I LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Winchester Power Park242 MW8.7 km
Fayette Power Project1,690 MW22.3 km
7V Solar Ranch240 MW31.1 km
Sim Gideon623 MW35.2 km
Lost Pines 1 Power Project609 MW35.3 km
Big Star Solar, LLC (Hybrid)280 MW38 km