← Back to map

7V Solar Ranch

Fayette County, Texas · EIA plant ID 64239 · Operator: 7V Solar Ranch, LLC
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate240MWSummer 240 MW
Generators1in service
Net generation536GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202725.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025501.323.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
7V1Solar PhotovoltaicPV240240Jan 2025Operating—coming soon

Owner / operator

Operator: 7V Solar Ranch, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
7V Solar Ranch, LLC100.0%240 MW

Nearby plants

Within 80 km.
Big Star Solar, LLC (Hybrid)280 MW21.3 km
Winchester Power Park242 MW23 km
Staccato BESS—31.1 km
Fayette Power Project1,690 MW33.5 km
Sim Gideon623 MW42.2 km
Lost Pines 1 Power Project609 MW42.4 km