7V Solar Ranch
Fayette County, Texas · EIA plant ID 64239 · Operator: 7V Solar Ranch, LLC
Nameplate240MWSummer 240 MW
Generators1in service
Net generation536GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2025
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 501.3 | 23.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 7V1 | Solar Photovoltaic | PV | 240 | 240 | Jan 2025 | Operating | — | coming soon |
Owner / operator
Operator: 7V Solar Ranch, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| 7V Solar Ranch, LLC | 100.0% | 240 MW |
Nearby plants
Within 80 km.
| Big Star Solar, LLC (Hybrid) | 280 MW | 21.3 km |
| Winchester Power Park | 242 MW | 23 km |
| Staccato BESS | — | 31.1 km |
| Fayette Power Project | 1,690 MW | 33.5 km |
| Sim Gideon | 623 MW | 42.2 km |
| Lost Pines 1 Power Project | 609 MW | 42.4 km |