← Back to map

Big Star Solar, LLC (Hybrid)

Bastrop County, Texas · EIA plant ID 64202 · Operator: RWE Clean Energy
SolarBatteriesSolar PhotovoltaicERCOTBA: ERCO
Nameplate280MWSummer 280 MW
Generators2in service
Net generation422GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-10010203040GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202724.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025372.125.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BGSTBBatteriesBA8080Sep 2026Operating—coming soon
BGSTSSolar PhotovoltaicPV200200Mar 2025Operating—coming soon

Owner / operator

Operator: RWE Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RWE Clean Energy100.0%280 MW

Nearby plants

Within 80 km.
7V Solar Ranch240 MW21.3 km
Sim Gideon623 MW28 km
Lost Pines 1 Power Project609 MW28.2 km
Winchester Power Park242 MW29.7 km
Staccato BESS—38 km
Bastrop Energy Center619 MW38.8 km