← Back to map

Sim Gideon

Bastrop County, Texas · EIA plant ID 3601 · Operator: Lower Colorado River Authority
Natural gasNatural Gas Steam TurbineERCOTBA: ERCO
Nameplate623MWSummer 607 MW
Generators3in service
Net generation827GWh12 mo to Dec 2025
Capacity factor16%gas/coal/oil units, summer MW
Heat rate11,230Btu/kWhfossil units, electric fuel, HHV
First online1965Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-50050100150200GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2005201020152020202515.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00011,00012,0002005201020152020202511,230 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20011,475.727.2%10,463
20021,309.624.1%10,696
20031,207.522.2%10,317
200496817.8%10,547
2005803.414.8%11,714
2006763.314.1%11,614
20071,001.818.4%11,664
20081,055.619.4%11,521
2009958.317.6%12,159
201087916.2%11,576
2011553.610.2%12,066
2012306.15.6%11,750
2013268.14.9%11,723
2014143.12.6%12,017
20152785.2%11,556
2016402.27.5%11,365
2017326.16.1%11,354
2018550.210.3%11,073
2019742.914.0%10,720
2020647.112.1%11,051
202166212.4%11,254
2022851.516.0%11,426
20231,195.722.5%11,299
20241,043.119.6%11,302
2025826.715.6%11,230

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Steam TurbineST136136May 1965Operating—coming soon
2Natural Gas Steam TurbineST136136Mar 1968Operating—coming soon
3Natural Gas Steam TurbineST351335May 1972Operating—coming soon

Owner / operator

Operator: Lower Colorado River Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Lower Colorado River Authority100.0%623 MW

Nearby plants

Within 80 km.
Lost Pines 1 Power Project609 MW0.3 km
Webberville Solar Project30 MW25.1 km
Bastrop Energy Center619 MW26.8 km
Big Star Solar, LLC (Hybrid)280 MW28 km
TX21 River Valley Storage 250 MW31 km
TX19 River Valley Storage 150 MW31.1 km