← Back to map

Webberville Solar Project

Travis County, Texas · EIA plant ID 57699 · Operator: FRV AE Solar LLC
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate30MWSummer 30 MW
Generators1in service
Net generation56GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh20122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202621.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201100.0%—
20126424.3%—
20135922.4%—
20145822.1%—
201553.720.4%—
201644.116.7%—
201762.423.8%—
201857.221.8%—
201956.521.5%—
202057.421.8%—
20215520.9%—
202262.823.9%—
202356.421.5%—
202456.321.3%—
202556.421.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
AES1Solar PhotovoltaicPV3030Dec 2011Operating—coming soon

Owner / operator

Operator: FRV AE Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
FRV AE Solar LLC100.0%30 MW

Nearby plants

Within 80 km.
Sand Hill696 MW10.5 km
GFTX BESS125 MW10.6 km
Austin TX GigaFactory5 MW10.8 km
Bastrop Energy Center619 MW11 km
Decker Creek206 MW12.3 km
Austin Gas Recovery5 MW15.2 km