← Back to map

Mohave Energy ParkPlanned

Mohave County, Arizona · EIA plant ID 69773 · Operator: Arizona Electric Pwr Coop Inc
Natural gasBA: WALC

242 MW planned (Natural Gas Fired Combustion Turbine), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GT1Natural Gas Fired Combustion TurbineGT60.543planned Dec 2027Planned—coming soon
GT2Natural Gas Fired Combustion TurbineGT60.543planned Dec 2027Planned—coming soon
GT3Natural Gas Fired Combustion TurbineGT60.543planned Dec 2027Planned—coming soon
GT4Natural Gas Fired Combustion TurbineGT60.543planned Dec 2027Planned—coming soon

Owner / operator

Operator: Arizona Electric Pwr Coop Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Mohave Electric at Fort Mohave4 MW5.8 km
Mohave Electric Cooperative at Joy Lane26 MW5.8 km
Mohave Energy - Hybrid33 MW6.8 km
South Point Energy Center708 MW7.3 km
Arida Solar (Hybrid)—21.9 km
Davis Dam255 MW29.5 km