Mohave Energy - Hybrid
Mohave County, Arizona · EIA plant ID 67178 · Operator: Mohave Energy
Nameplate33MWSummer 33 MW
Generators2in service
Net generation44GWh12 mo to Aug 2026
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2023
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 38.7 | 25.1% | — |
| 2025 | 45.7 | 29.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| MEBA | Batteries | BA | 15 | 15 | Sep 2023 | Operating | — | coming soon |
| MEPV | Solar Photovoltaic | PV | 17.6 | 17.6 | Sep 2023 | Operating | — | coming soon |
Owner / operator
Operator: Mohave Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Mohave Energy | 100.0% | 33 MW |
Nearby plants
Within 80 km.
| Mohave Electric at Fort Mohave | 4 MW | 1.2 km |
| Mohave Electric Cooperative at Joy Lane | 26 MW | 1.2 km |
| Mohave Energy Park | — | 6.8 km |
| South Point Energy Center | 708 MW | 14 km |
| Arida Solar (Hybrid) | — | 16.8 km |
| Davis Dam | 255 MW | 22.7 km |