Mohave Electric at Fort Mohave
Mohave County, Arizona · EIA plant ID 59819 · Operator: mohave electric coop inc
Nameplate4MWSummer 4 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor6%solar units, summer MW
Heat rate—thermal plants only
First online2015
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2015 | 7.4 | 25.4% | — |
| 2016 | 14.6 | 24.1% | — |
| 2017 | 39.3 | 31.2% | — |
| 2018 | 39.9 | 31.6% | — |
| 2019 | 9.6 | 25.0% | — |
| 2020 | 10.1 | 26.1% | — |
| 2021 | 9.5 | 24.6% | — |
| 2022 | 9.6 | 24.9% | — |
| 2023 | 8.2 | 21.2% | — |
| 2024 | 9.2 | 23.8% | — |
| 2025 | 8 | 20.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | PV | 4.4 | 4.4 | Apr 2015 | Operating | — | coming soon |
| PV2 | Solar Photovoltaic | PV | 10 | 10 | Oct 2016 | not_current | — | coming soon |
Owner / operator
Operator: mohave electric coop inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| mohave electric coop inc | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| Mohave Electric Cooperative at Joy Lane | 26 MW | 0 km |
| Mohave Energy - Hybrid | 33 MW | 1.2 km |
| Mohave Energy Park | — | 5.8 km |
| South Point Energy Center | 708 MW | 13.2 km |
| Arida Solar (Hybrid) | — | 17 km |
| Davis Dam | 255 MW | 23.7 km |