Uva Creek SolarPlanned
Borden County, Texas · EIA plant ID 68739 · Operator: Red River Clean Energy
301 MW planned (Solar Photovoltaic), first expected Aug 2028 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| UVAPV | Solar Photovoltaic | PV | 301 | 301 | planned Aug 2028 | Planned | — | coming soon |
Owner / operator
Operator: Red River Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Gail Mountain Solar | — | 4.4 km |
| ENGIE Long Draw Solar LLC | 225 MW | 12.9 km |
| Borden County BESS | 150 MW | 13.4 km |
| Juno Solar Project | 306 MW | 14.8 km |
| Iron Belt | — | 20.1 km |
| Mesquite Creek Wind | 211 MW | 22.3 km |