Uva Creek SolarPlanned

Borden County, Texas · EIA plant ID 68739 · Operator: Red River Clean Energy
SolarERCOTBA: ERCO

301 MW planned (Solar Photovoltaic), first expected Aug 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
UVAPVSolar PhotovoltaicPV301301planned Aug 2028Planned—coming soon

Owner / operator

Operator: Red River Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Gail Mountain Solar—4.4 km
ENGIE Long Draw Solar LLC225 MW12.9 km
Borden County BESS150 MW13.4 km
Juno Solar Project306 MW14.8 km
Iron Belt—20.1 km
Mesquite Creek Wind211 MW22.3 km