← Back to map

Iron BeltPlanned

Borden County, Texas · EIA plant ID 67059 · Operator: Iron Belt Energy Storage Project, LLC
BatteryERCOTBA: ERCO

400 MW planned (Batteries), first expected Jun 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1BatteriesBA400400planned Jun 2027Planned—coming soon

Owner / operator

Operator: Iron Belt Energy Storage Project, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Mesquite Creek Wind211 MW17.8 km
Borden County BESS150 MW18.6 km
Uva Creek Solar—20.1 km
ENGIE Long Draw Solar LLC225 MW21 km
Gail Mountain Solar—21.6 km
Lamesa II50 MW27.4 km