← Back to map

Mesquite Creek Wind

Dawson County, Texas · EIA plant ID 59332 · Operator: Duke Energy Renewables Services
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate211MWSummer 211 MW
Generators1in service
Net generation405GWh12 mo to Aug 2026
Capacity factor22%wind units, summer MW
Heat rate—thermal plants only
First online2015

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh20162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20162018202020222024202621.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2015552.939.7%—
2016727.939.2%—
2017690.637.3%—
2018759.141.0%—
201969137.4%—
2020721.938.9%—
2021627.633.9%—
2022584.931.6%—
2023554.730.0%—
2024409.122.1%—
2025481.926.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MSCRKOnshore Wind TurbineWT211.2211.2Apr 2015Operating—ge 1.7-100

Owner / operator

Operator: Duke Energy Renewables Services. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Mesquite Creek Wind, LLC100.0%211 MW

Nearby plants

Within 80 km.
Borden County BESS150 MW9.9 km
ENGIE Long Draw Solar LLC225 MW12.1 km
Lamesa II50 MW13.6 km
Lamesa Solar102 MW17.4 km
Iron Belt—17.8 km
Al Pastor Battery Storage Plant100 MW18.5 km