ENGIE Long Draw Solar LLC
Borden County, Texas · EIA plant ID 62845 · Operator: Engie North America
Nameplate225MWSummer 225 MW
Generators1in service
Net generation486GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2020
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 0.1 | 0.1% | — |
| 2021 | 528.6 | 26.8% | — |
| 2022 | 540.4 | 27.4% | — |
| 2023 | 504.8 | 25.6% | — |
| 2024 | 529.8 | 26.8% | — |
| 2025 | 519.4 | 26.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SP1 | Solar Photovoltaic | PV | 225 | 225 | Dec 2020 | Operating | — | coming soon |
Owner / operator
Operator: Engie North America. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Engie Longdraw Solar LLC | 100.0% | 225 MW |
Nearby plants
Within 80 km.
| Borden County BESS | 150 MW | 2.6 km |
| Gail Mountain Solar | — | 9.3 km |
| Mesquite Creek Wind | 211 MW | 12.1 km |
| Uva Creek Solar | — | 12.9 km |
| Stephens Ranch Wind Energy LLC | 376 MW | 20.7 km |
| Iron Belt | — | 21 km |