← Back to map

Rexford 2 Solar FarmPlanned

Tulare County, California · EIA plant ID 68485 · Operator: 22SV 8ME LLC
SolarCAISOBA: CISO

400 MW planned (Batteries, Solar Photovoltaic), first expected Dec 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
22SVASolar PhotovoltaicPV200200planned Dec 2028Planned—coming soon
22SVBBatteriesBA200200planned Dec 2028Planned—coming soon

Owner / operator

Operator: 22SV 8ME LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
White River Solar 220 MW3.7 km
CED Ducor 120 MW4.3 km
CED Ducor 220 MW5.6 km
CED Ducor 315 MW5.8 km
Rexford Solar Farm540 MW5.9 km
Bottleneck Energy Storage80 MW6.2 km