← Back to map

Rexford Solar Farm

Tulare County, California · EIA plant ID 64633 · Operator: aes clean energy
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate540MWSummer 540 MW
Generators2in service
Net generation712GWh12 mo to Aug 2026
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202728.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025658.228.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
20SD8Solar PhotovoltaicPV300300Feb 2025Operating—coming soon
20SDBBatteriesBA240240Feb 2025Operating—coming soon

Owner / operator

Operator: aes clean energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
aes clean energy100.0%540 MW

Nearby plants

Within 80 km.
Bottleneck Energy Storage80 MW0.6 km
CED Ducor 220 MW1.4 km
CED Ducor 120 MW2.2 km
CED Ducor 315 MW2.4 km
Nicolis Solar PV Plant20 MW2.5 km
Tropico Solar PV Plant14 MW2.6 km