Nicolis Solar PV Plant

Tulare County, California · EIA plant ID 59600 · Operator: CD Arevon USA, Inc.
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 19 MW
Generators1in service
Net generation46GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202627.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201610.318.4%—
201750.830.5%—
201849.930.0%—
201950.230.2%—
202047.228.3%—
202140.224.1%—
202240.824.5%—
202343.826.3%—
202439.423.6%—
202546.327.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Solar PhotovoltaicPV2019Sep 2016Operating—coming soon

Owner / operator

Operator: CD Arevon USA, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CD Arevon USA, Inc.100.0%20 MW

Nearby plants

Within 80 km.
Tropico Solar PV Plant14 MW0.4 km
CED Ducor 315 MW1.1 km
CED Ducor 220 MW1.4 km
Luciana56 MW1.5 km
Rexford Solar Farm540 MW2.5 km
CED Ducor 120 MW2.5 km