← Back to map

LucianaRetirement planned

Tulare County, California · EIA plant ID 64909 · Operator: tulare solar center, llc
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate56MWSummer 56 MW
Generators1in service
Net generation138GWh12 mo to Aug 2026
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2022Retirement planned Apr 2057

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20222023202420252026202728.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202298.626.8%—
2023127.226.0%—
202412525.5%—
2025137.128.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TSCSolar PhotovoltaicPV55.855.8Apr 2022Operating · retirement plannedApr 2057coming soon

Owner / operator

Operator: tulare solar center, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
tulare solar center, llc100.0%56 MW

Nearby plants

Within 80 km.
Tropico Solar PV Plant14 MW1.1 km
Nicolis Solar PV Plant20 MW1.5 km
CED Ducor 220 MW2.3 km
CED Ducor 315 MW2.5 km
Rexford Solar Farm540 MW2.6 km
Bottleneck Energy Storage80 MW2.9 km