Bottleneck Energy Storage

Tulare County, California · EIA plant ID 66757 · Operator: VESI 12 LLC
BatteryBatteriesCAISOBA: CISO
Nameplate80MWSummer 80 MW
Generators1in service
Net generation-17GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-2-1.5-1-0.50GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-1.5——
2025-13.4——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BN1BatteriesBA8080Oct 2024Operating—coming soon

Owner / operator

Operator: VESI 12 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
VESI 12 LLC100.0%80 MW

Nearby plants

Within 80 km.
Rexford Solar Farm540 MW0.6 km
CED Ducor 220 MW1.9 km
CED Ducor 120 MW2.7 km
Luciana56 MW2.9 km
Nicolis Solar PV Plant20 MW2.9 km