← Back to map

White River Solar 2

Tulare County, California · EIA plant ID 58973 · Operator: RWE Clean Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation49GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202628.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201411.219.3%—
201553.130.6%—
201652.930.4%—
201751.229.5%—
201849.728.6%—
201949.928.8%—
202049.328.4%—
20215028.8%—
202252.230.1%—
202349.328.4%—
202448.427.9%—
202549.228.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
W2CASolar PhotovoltaicPV19.819.8Sep 2014Operating—coming soon

Owner / operator

Operator: RWE Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RWE Clean Energy100.0%20 MW

Nearby plants

Within 80 km.
CED Ducor 120 MW2.9 km
CED Ducor 420 MW3.2 km
CED Ducor 315 MW3.4 km
Rexford 2 Solar Farm—3.7 km
CED Ducor 220 MW3.9 km
Nicolis Solar PV Plant20 MW4.4 km