Open Sky Dairy
Fresno County, California · EIA plant ID 68471 · Operator: renewable solar, inc
Nameplate2MWSummer 2 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor3%solar units, summer MW
Heat rate—thermal plants only
First online2024
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 2.1 | 28.0% | — |
| 2025 | 0.4 | 2.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 18880 | Solar Photovoltaic | PV | 1.7 | 1.7 | Jul 2024 | Operating | — | coming soon |
Owner / operator
Operator: renewable solar, inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Open Sky Dairy | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Open Sky Ranch Inc | 2 MW | 0.1 km |
| Five Points Pipeline | 4 MW | 2.4 km |
| Van der Hoek Solar Array/ Dairy | 2 MW | 7.8 km |
| Five Points Solar Station | 15 MW | 9.3 km |
| Stroud Solar Station | 20 MW | 10.5 km |
| Westside Solar Station | 15 MW | 12.4 km |