Fresno County, California · EIA plant ID 57497 · Operator: Pacific Gas & Electric Co
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation15GWh12 mo to Dec 2025
Capacity factor8%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201220142016201820202022202420268.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20117.312.4%—
201243.124.5%—
201344.925.7%—
201442.724.4%—
20154123.4%—
201638.521.9%—
201734.819.8%—
201837.321.3%—
201933.519.1%—
202033.719.2%—
20213218.3%—
202229.516.8%—
202324.514.0%—
202421.312.1%—
202514.98.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV2020Sep 2011Operating—coming soon

Owner / operator

Operator: Pacific Gas & Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Pacific Gas & Electric Co100.0%20 MW

Nearby plants

Within 80 km.
Van der Hoek Solar Array/ Dairy2 MW3.1 km
San Joaquin Solar21 MW3.8 km
Darden III Solar—8.3 km
Fresno Solar3 MW9.5 km
Fresno Cogen Partners87 MW9.5 km
Darden I Solar—10.3 km