← Back to map

Five Points Pipeline

Fresno County, California · EIA plant ID 69900 · Operator: Maas Energy Works
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate4MWSummer 4 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor1%solar units, summer MW
Heat rate—thermal plants only
First online2025

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520MWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%0%0%1%202520260.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202500.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
26818Solar PhotovoltaicPV4.14.1Dec 2025Operating—coming soon

Owner / operator

Operator: Maas Energy Works. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Maas Energy Works100.0%4 MW

Nearby plants

Within 80 km.
Open Sky Ranch Inc2 MW2.4 km
Open Sky Dairy2 MW2.4 km
Van der Hoek Solar Array/ Dairy2 MW8.3 km
Stroud Solar Station20 MW10.4 km
Five Points Solar Station15 MW11.8 km
San Joaquin Solar21 MW13.4 km