Fence Post Solar Hybrid Project, LLC
Navarro County, Texas · EIA plant ID 66801 · Operator: Fence Post Solar Project, LLC
Nameplate308MWSummer 306 MW
Generators2in service
Net generation526GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2024
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 156 | 22.7% | — |
| 2025 | 523.7 | 25.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| FNCBE | Batteries | BA | 72 | 70 | Sep 2024 | Operating | — | coming soon |
| FNCPT | Solar Photovoltaic | PV | 236 | 236 | Sep 2024 | Operating | — | coming soon |
Owner / operator
Operator: Fence Post Solar Project, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Fence Post Solar Project, LLC | 100.0% | 308 MW |
Nearby plants
Within 80 km.
| Armadillo Solar Center | — | 8.3 km |
| Elm Flats Solar | — | 8.9 km |
| Gaia Hybrid | 230 MW | 10.1 km |
| Bluebonnet Prairie Wind | — | 10.7 km |
| Trinidad (TX) | 243 MW | 12.9 km |
| Main Horn Solar | — | 16.6 km |