Gaia Hybrid

Navarro County, Texas · EIA plant ID 66342 · Operator: Sunraycer Assets I LLC
SolarBatteriesSolar PhotovoltaicERCOTBA: ERCO
Nameplate230MWSummer 230 MW
Generators2in service
Net generation152GWh12 mo to Aug 2026
Capacity factor68%solar units, summer MW
Heat rate—thermal plants only
First online2026

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2026202767.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GAIABBatteriesBA76.876.8Jul 2026Operating—coming soon
GAIASSolar PhotovoltaicPV152.7152.7Jul 2026Operating—coming soon

Owner / operator

Operator: Sunraycer Assets I LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Sunraycer Assets I LLC100.0%230 MW

Nearby plants

Within 80 km.
Trinidad (TX)243 MW9.7 km
Bluebonnet Prairie Wind—10.1 km
Fence Post Solar Hybrid Project, LLC308 MW10.1 km
Elm Flats Solar—11.6 km
Malakoff Solar Project10 MW16.9 km
Armadillo Solar Center—17.9 km