Gaia Hybrid
Navarro County, Texas · EIA plant ID 66342 · Operator: Sunraycer Assets I LLC
Nameplate230MWSummer 230 MW
Generators2in service
Net generation152GWh12 mo to Aug 2026
Capacity factor68%solar units, summer MW
Heat rate—thermal plants only
First online2026
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GAIAB | Batteries | BA | 76.8 | 76.8 | Jul 2026 | Operating | — | coming soon |
| GAIAS | Solar Photovoltaic | PV | 152.7 | 152.7 | Jul 2026 | Operating | — | coming soon |
Owner / operator
Operator: Sunraycer Assets I LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Sunraycer Assets I LLC | 100.0% | 230 MW |
Nearby plants
Within 80 km.
| Trinidad (TX) | 243 MW | 9.7 km |
| Bluebonnet Prairie Wind | — | 10.1 km |
| Fence Post Solar Hybrid Project, LLC | 308 MW | 10.1 km |
| Elm Flats Solar | — | 11.6 km |
| Malakoff Solar Project | 10 MW | 16.9 km |
| Armadillo Solar Center | — | 17.9 km |