Malakoff Solar Project

Henderson County, Texas · EIA plant ID 69261 · Operator: Ellomay USA Inc
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate10MWSummer 10 MW
Generators2in service
Net generation16GWh12 mo to Dec 2025
Capacity factor72%solar units, summer MW
Heat rate—thermal plants only
First online2025

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2025202672.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202515.972.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MLKF1Solar PhotovoltaicPV55Oct 2025Operating—coming soon
MLKF2Solar PhotovoltaicPV55Oct 2025Operating—coming soon

Owner / operator

Operator: Ellomay USA Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ellomay USA Inc100.0%10 MW

Nearby plants

Within 80 km.
Forest Grove - Dodd—9.5 km
Trinidad (TX)243 MW10.2 km
Gaia Hybrid230 MW16.9 km
Pauline BESS10 MW17.3 km
Tanzanite Storage283 MW17.7 km
Fence Post Solar Hybrid Project, LLC308 MW23 km