Malakoff Solar Project
Henderson County, Texas · EIA plant ID 69261 · Operator: Ellomay USA Inc
Nameplate10MWSummer 10 MW
Generators2in service
Net generation16GWh12 mo to Dec 2025
Capacity factor72%solar units, summer MW
Heat rate—thermal plants only
First online2025
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 15.9 | 72.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| MLKF1 | Solar Photovoltaic | PV | 5 | 5 | Oct 2025 | Operating | — | coming soon |
| MLKF2 | Solar Photovoltaic | PV | 5 | 5 | Oct 2025 | Operating | — | coming soon |
Owner / operator
Operator: Ellomay USA Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Ellomay USA Inc | 100.0% | 10 MW |
Nearby plants
Within 80 km.
| Forest Grove - Dodd | — | 9.5 km |
| Trinidad (TX) | 243 MW | 10.2 km |
| Gaia Hybrid | 230 MW | 16.9 km |
| Pauline BESS | 10 MW | 17.3 km |
| Tanzanite Storage | 283 MW | 17.7 km |
| Fence Post Solar Hybrid Project, LLC | 308 MW | 23 km |