Main Horn SolarPlanned

Navarro County, Texas · EIA plant ID 69636 · Operator: Main Horn Solar LLC
SolarERCOTBA: ERCO

100 MW planned (Solar Photovoltaic), first expected Dec 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
69363Solar PhotovoltaicPV100100planned Dec 2029Planned—coming soon

Owner / operator

Operator: Main Horn Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Whistle Solar—6.7 km
Tehuacana Creek 1 Solar and BESS—9 km
Oak Valley Solar—13 km
WAL5651 MW13.5 km
Pisgah Ridge Solar, LLC250 MW13.7 km
Elm Flats Solar—15.5 km