Tehuacana Creek 1 Solar and BESSUnder construction

Navarro County, Texas · EIA plant ID 65855 · Operator: Parliament Energy Holdings LLC
SolarERCOTBA: ERCO

1,063 MW under construction (Batteries, Solar Photovoltaic), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 1,063 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TE1BSBatteriesBA418418planned Dec 2026Under construction—coming soon
TE1PVSolar PhotovoltaicPV644.8644.8planned May 2027Under construction—coming soon

Owner / operator

Operator: Parliament Energy Holdings LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Pisgah Ridge Solar, LLC250 MW5.4 km
Whistle Solar—8.2 km
Main Horn Solar—9 km
Oak Valley Solar—13.7 km
WAL5651 MW20.8 km