Bishop Ranch - BR 1-Y

Contra Costa County, California · EIA plant ID 66799 · Operator: distributed solar development, llc
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators4in service
Net generation2GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2022202320242025202617.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202200.0%—
20231.616.7%—
20241.717.9%—
20251.717.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
4087Solar PhotovoltaicPV0.70.7Mar 2022Operating—coming soon
4087BBatteriesBA0.70.7Mar 2022Operating—coming soon
4087GSolar PhotovoltaicPV0.20.2Mar 2022Operating—coming soon
4087RSolar PhotovoltaicPV0.20.2Mar 2022Operating—coming soon

Owner / operator

Operator: distributed solar development, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
distributed solar development, llc100.0%2 MW

Nearby plants

Within 80 km.
Bishop Ranch BR 1-X1 MW0.3 km
Bishop Ranch - BR 3-HH—0.5 km
Bishop Ranch - BR 3-GG—0.6 km
Bishop Ranch - BR 26003 MW0.6 km
Bishop Ranch - BR 3-FF—0.7 km
Bishop Ranch - BR 8-P2 MW1 km