Bishop Ranch - BR 3-GGUnder construction
Contra Costa County, California · EIA plant ID 69706 · Operator: Camino Ramon BR 3-GG Solar Project 2020, LLC
2 MW under construction (Batteries, Solar Photovoltaic), first expected Jul 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 2 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 4149B | Batteries | BA | 0.6 | 0.6 | planned Jul 2027 | Under construction | — | coming soon |
| 4149C | Solar Photovoltaic | PV | 1.1 | 1.1 | planned Jul 2027 | Under construction | — | coming soon |
| 4149R | Solar Photovoltaic | PV | 0.2 | 0.2 | planned Jul 2027 | Under construction | — | coming soon |
Owner / operator
Operator: Camino Ramon BR 3-GG Solar Project 2020, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Bishop Ranch - BR 3-HH | — | 0.1 km |
| Bishop Ranch - BR 3-FF | — | 0.1 km |
| Bishop Ranch - BR 2600 | 3 MW | 0.3 km |
| Bishop Ranch - BR 1-Y | 2 MW | 0.6 km |
| Bishop Ranch - BR 15-DD | 1 MW | 0.6 km |
| Bishop Ranch - BR 15-CC | 1 MW | 0.7 km |